ECO 86501 Estimating Industry Demand for Fresh Market Carrots

ECO 86501 Estimating Industry Demand for Fresh Market Carrots in $11 only
gallery-thumbnails

CONSULTING PROJECT

Estimating Industry Demand for Fresh Market Carrots
The market for carrots is comprised of two segments: fresh market carrots, which have excellent, uniform color and a small core, and processing carrots, which are larger than fresh market carrots but still have good flavor, color, and sweetness. Annual data for the years 1983–2000 in the fresh market segment of the carrot industry are presented below. Q is total annual fresh market carrot production (measured in thousands of hundred weight units, which are 100,000 pound units), P is average annual real price per hundred weight of fresh market carrots (in constant 1991 dollars),1 and W is a weather index based on temperature and rainfall (W varies directly with conduciveness of weather for growing carrots). To account for the increasing popularity of carrots during the sample period, the time variable t is added to the demand equation to reflect growing popularity of carrots. The production data do not account for imports and exports of carrots. During the period of this sample, however, net exports of carrots (exports minus imports) were quite small in every year.

t
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000

Q
7,242
8,220
8,886
9,300
9,593
10,758
10,356
11,322
11,741
12,486
13,927
15,072
14,969
14,163
15,589
16,192
15,479
17,992

P
10.03
6.62
10.47
12.59
11.54
10.56
13.88
14.01
14.71
13.15
13.16
16.14
18.06
19.45
19.65
17.29
19.22
19.24

W
100.0
108.3
109.5
96.3
98.3
101.2
101.5
100.6
111.8
109.0
112.3
115.4
107.2
90.5
92.5
95.6
94.8
98.7

Consider the following specification of empirical demand and supply functions in the fresh market
segment of the carrot industry:2
Qd = a + bP + ct
Qs = d + eP + f W

a. Should the ordinary least-squares (OLS) method or the two-stage least-squares method (2SLS) method be employed to estimate market demand for carrots? Explain briefly.

b. Which variables are endogenous variables in the system? Which variables are exogenous? For the model specified above, is the demand for fresh market carrots identified? Explain why or why not?
1
2

Since carrots are planted and harvested year-round, carrot prices are computed as average prices for each year. Typically farmers make production decisions for the current year using the previous year’s crop prices (or a weighted-average of several previous years of crop prices). Since carrots are planted year-round, it is not unreasonable to specify current annual production as a function of current average price of carrots.

c. Using statistical software, estimate the parameters of the empirical demand function specified in part a. Write the estimated industry demand equation for carrots.

d. Are the estimated slope parameters of demand statistically significant at the 15 percent level of significance? Are the algebraic signs of the parameter estimates b and c reasonable? Explain.

e. Would you expect the demand for carrots to be elastic or inelastic when measured at the average price over the period of the sample? (Hint: Consider the discussion in Chapter 3 concerning the factors that influence demand elasticity.)

f. Compute the price elasticity of demand for carrots measured at the sample mean values of price (P), quantity (Q), and time (t). Is the demand for fresh market carrots elastic, inelastic, or unitary elastic when measured at the sample mean values of P, Q, and t?

g. By approximately what percentage amount would the price of carrots have to fall in order for quantity demanded to increase by 10 percent?

h. Explain, in quantitative terms, the meaning of the estimate of the slope parameter on t.

Price of Answer: Just US$11 onlyBuy Now

Need Assistance…??  email us at [email protected].

If you need any type of help regarding Homework, Assignments, Projects, Case study, Essay writing or any thing else then just email us at [email protected]solvemyquestion.com.  We will get back to you ASAP. Do not forget to maintain the time frame you need you work to be done.