Mabbut Company Departmental Manufacturing Layout

Mabbut Company Departmental Manufacturing Layout

Mabbut Company Departmental Manufacturing Layout for $9 Only (Instant Download)

Mabbut Company has the following departmental manufacturing layout for one of its plants:

10 minutes 5 minutes Move and wait time- 20 minutes Wait time 12 minutes Welding Cutting Move and wait time 25 minutes minutes 8 minutes Move and wait time -18 minutes Polishing

A consulting firm recommended a value stream with the following manufacturing cell:

10 minutes 5 minutes Cutting Welding Polishing Finishing /minutes 8 minutes

Required:

1. Calculate the total time it takes to produce a batch of 10 units using the traditional departmental manufacturing layout.

minutes = “Find me”

2. Using cellular manufacturing, how much time is saved producing the same batch of 10 units?
minutes =”Find me”

Assuming the cell operates continuously, what is the production rate?
units per hour = 6

3. Assume the processing time of Welding is reduced to 6 minutes, while the times of the other processes stay the same. What is the production rate now? Round your answer to one decimal place.

units per hour =”Find me”

How long will it take to produce a batch of 10 units if the cell is in a continuous production mode?

minutes = 75

Price of Answer: Just US$9 only (Instant Download)

Buy Now

Need Assistance…??  email us at [email protected].

If you need any type of help regarding Homework, Assignments, Projects, Case study, Essay writing or anything else then just email us at [email protected]solvemyquestion.com.  We will get back to you ASAP. Do not forget to maintain the time frame you need your work to be done.